How Data Center Construction Is Changing Temporary Power Requirements

How Data Center Construction Is Changing Temporary Power Requirements

The rapid expansion of artificial intelligence is creating a new kind of construction project across the United States: enormous data center campuses that require electrical infrastructure on a scale few commercial projects have encountered before.

Long before the servers are running, thousands of workers need electricity to construct the buildings, install cooling systems, build substations, commission generators, test electrical infrastructure, illuminate work areas, and bring individual sections of the facility online. Temporary power therefore becomes a critical part of building the permanent power system itself.

For contractors working on these projects, temporary electrical infrastructure must be able to grow and change alongside the facility. High-amperage connections, portable distribution, heavy-duty cable assemblies, NEMA connections, and temporary lighting all have important roles to play.

The Scale of Today’s AI Data Center Construction

Oracle’s Abilene, Texas AI data center provides an extraordinary example of how large these projects have become. The Stargate campus supporting OpenAI operates on Oracle Cloud Infrastructure and consists of eight buildings across approximately 1,100 acres, totaling roughly four million square feet. Oracle reports that AI workloads began operating less than a year after construction started.

Building something at that scale requires an enormous workforce. As of June 2026, Oracle reported that the Abilene project had accumulated nearly 20 million worker hours, with as many as 9,000 workers onsite during construction. More than 14,000 safety inspections had already been conducted.

And Abilene is only part of the expansion. Oracle says its New Mexico and Wisconsin campuses are each expected to create approximately 4,000 construction jobs, while another Texas development in Shackelford County is expected to require around 5,000 construction workers.

OpenAI and Oracle previously announced plans for an additional 4.5 gigawatts of Stargate capacity, bringing their combined capacity under development at the time to more than five gigawatts. OpenAI estimated that developing and operating that additional capacity could support more than 100,000 direct, construction, operational, manufacturing, and service jobs.

These are not simply buildings filled with computers. They are massive electrical and mechanical construction projects.

Building the Power System Before the Data Center Has Power

One of the interesting challenges of data center construction is that crews need substantial amounts of electricity while they are still constructing the infrastructure that will eventually provide permanent power.

Electricians need power while installing switchgear and distribution equipment. Mechanical contractors are installing cooling infrastructure. Welders, construction crews, commissioning teams, equipment installers, and technicians may all be operating simultaneously throughout different sections of the campus.

Meanwhile, substations, backup generation, cooling systems, data halls, and permanent electrical distribution may be at completely different stages of completion.

Temporary power provides the bridge.

Instead of waiting for the entire permanent electrical system to become operational, temporary distribution can allow individual work areas and equipment to receive power as construction progresses. As one building or section becomes operational, temporary equipment can be relocated to the next active construction zone.

High-Amperage Connections Become Especially Important

The amount of power moving around a project of this scale makes high-amperage connection equipment particularly important.

Duraline’s 518 Series Single Pole Connectors and Receptacles are especially well suited to applications where large amounts of power need to be connected and disconnected reliably.

The 518 family is designed and tested for AC or DC applications from 50 to 1,000 amps and voltages up to 5kV in a single connector. Multiple connectors can also be combined for applications requiring even greater amperage. Duraline specifically identifies generators and power plants among the applications for the 518 Series.

The design uses a 360-degree ball-and-socket locking collet, allowing connectors to mate without requiring a specific orientation. There is no cam or keyway that needs to be aligned before the connection can be made. Once connected, the locking ring provides positive retention while still permitting rotation—even when used with rigid cable.

For a construction project involving extensive temporary generation and power distribution, that combination of high capacity, quick connection, and positive locking can make the 518 Series an excellent interface between generators, distribution equipment, and other high-power systems.

Explore Duraline 518 Series High-Amperage Connectors

Cable Matters Just as Much as the Connector

A high-amperage connector is only one component of the electrical assembly. The cable attached to it must also be selected for the voltage, amperage, conductor size, length, and physical requirements of the application.

Duraline supplies the 518 Series on 600-volt cable as standard, with 1kV, 2kV, and 5kV cable options available for applications requiring higher voltage ratings. The connectors are built to the customer’s electrical specifications, including voltage, amperage, cable size, and identification colors.

That customization is particularly useful during data center construction because not every temporary feeder performs the same job.

A generator connection may require a very different cable assembly than a smaller temporary distribution circuit. Instead of trying to force one cable configuration across an entire construction site, assemblies can be specified around the actual electrical requirements of each portion of the system.

Cam-Type Connectors Provide Another High-Power Option

Duraline’s Single Pole Cam-Type Connectors provide another option for high-current temporary power distribution.

The product family includes E1017, E1022, E1023, field-attachable, and polarized configurations, with Duraline Cam-Type products available for applications up to 690 amps continuous and 600 volts AC/DC, depending on configuration.

These connectors can be useful anywhere high-power equipment needs to be connected and disconnected as the temporary electrical layout changes.

Explore Duraline Single Pole Cam-Type Connectors

For a large data center construction project, having multiple high-power connection options gives electrical contractors more flexibility when designing generator feeds, temporary distribution, testing systems, and other high-load applications.

Distribution Panels Turn High-Amperage Power Into Usable Jobsite Power

Getting hundreds of amps onto a construction site solves only half of the problem. That power then has to be safely distributed to the crews and equipment that actually need it.

Duraline designs and manufactures Portable Power Distribution Electrical Panels for temporary electrical service, including applications involving large construction sites, plant maintenance, utilities, and multi-building complexes.

Explore Duraline Portable Power Distribution Panels

For data center construction, custom distribution becomes particularly valuable because different phases of the project may have very different electrical requirements. A panel can be configured around the incoming power, required circuits, connector styles, receptacles, and protection required for that particular work area.

As construction moves across a multi-building campus, portable distribution equipment can move with it.

NEMA Connections Bring Power to Individual Work Areas

Once power has been stepped down and distributed appropriately, familiar NEMA connections become useful for supplying smaller equipment throughout the jobsite.

Duraline offers industrial NEMA configurations including 5-15, 5-20, L14-20, L21-20, and L21-30, along with extensions, pigtails, and custom assemblies.

Three-phase NEMA power stringers provide an especially useful example. Duraline offers L21-30 and 5-20R configurations molded to 10/5 SOOW 600-volt cable, creating a heavy-duty temporary distribution assembly that can bring multiple usable outlets closer to the work area.

Explore Duraline NEMA Plugs, Connectors and Receptacles

This creates a natural progression from high-amperage generation and feeder connections down to the receptacles used by workers and equipment throughout the site.

Temporary Lighting Is Part of the Electrical Infrastructure

A data center construction project does not stop when exterior daylight disappears.

Crews may be working inside enormous unfinished buildings where permanent lighting has not yet been installed or energized. Electrical rooms, mechanical spaces, data halls, corridors, equipment areas, and exterior work zones all require dependable illumination while construction continues.

Duraline’s Temporary Lighting Stringers are molded to heavy-duty 600-volt SOOW cable and designed for demanding indoor, outdoor, and wet-location applications. Standard LED stringers use integrally molded sockets on 14/3 SOOW cable, with protective guards and LED lamps supplied as part of the assembly.

Explore Duraline Temporary Lighting Systems

For large open spaces, Duraline’s Wide Area LED systems provide another option for illuminating substantial work areas without relying on permanent building lighting.

Temporary lighting therefore isn’t an accessory to a project this large. It is part of the infrastructure that allows thousands of workers to safely continue building the facility.

Commissioning Creates Another Temporary Power Challenge

Construction eventually gives way to commissioning, but that doesn’t mean temporary power disappears immediately.

Data centers contain interconnected electrical, cooling, backup generation, controls, networking, and computing systems that have to be brought online and verified in stages. Individual systems may need to be energized and tested before the entire permanent facility is operating normally.

Oracle’s Abilene project illustrates just how closely construction and operation can overlap. AI workloads began running while significant portions of the larger campus were still being completed, and Oracle currently reports that 42% of the site’s total planned capacity has been delivered, with additional capacity scheduled for subsequent quarters.

That staged approach means temporary and permanent infrastructure can exist side by side.

Reliable connectors and portable distribution equipment give commissioning teams the ability to establish, relocate, and remove temporary electrical connections as individual systems transition into permanent operation.

Reliability Matters When Thousands of Workers Depend on Power

The sheer labor involved in these projects changes the economics of temporary power equipment.

When a small crew loses an electrical connection, several workers may temporarily stop working. When a construction campus employs thousands of people across multiple trades, unreliable electrical infrastructure has the potential to affect far more activity.

Oracle’s nearly 20 million worker hours at Abilene provide a useful sense of scale.

Temporary electrical equipment on a project like this therefore needs to be selected with the same mindset applied to other critical construction infrastructure: capacity, durability, serviceability, safety, and the ability to adapt as the project changes.

A connector isn’t merely connecting two cables. It can be part of the temporary infrastructure supporting electricians, mechanical contractors, equipment installers, commissioning teams, and construction crews working toward bringing an enormous permanent electrical system online.

Temporary Power Is Helping Build the Infrastructure of AI

The AI boom is often discussed in terms of GPUs, servers, and software, but none of those technologies operate without an enormous physical infrastructure behind them.

OpenAI’s Stargate expansion with Oracle alone has involved plans for multiple gigawatts of new U.S. data center capacity, while Oracle’s Abilene campus demonstrates the extraordinary amount of construction labor required to turn that capacity into an operating facility.

Before permanent substations, cooling systems, backup generation, data halls, and server racks can operate together, crews need a dependable way to power the work required to build them.

That creates an important role for high-amperage 518 Series connectors, Cam-Type connections, custom distribution panels, rugged cable assemblies, NEMA distribution, and temporary lighting.

Build Temporary Power Around the Project

Every data center construction project has different electrical requirements. Generator capacity, available service, voltage, feeder lengths, construction phases, distribution locations, and equipment loads can all influence how temporary power should be configured.

Duraline’s product families make it possible to approach that challenge as a complete system—from 50-to-1,000-amp 518 Series quick-disconnect connections and high-power Cam-Type connectors to custom distribution panels, NEMA assemblies, SOOW temporary lighting, and specialized cable configurations.

Rather than forcing the project around an off-the-shelf electrical system, Duraline can work with contractors and project teams to develop assemblies around the power requirements of the job.

Contact the Duraline sales team at 386-873-2990 to discuss temporary power requirements for data center construction, commissioning, generator distribution, or other large-scale industrial projects.